Friday, 8 January 2016

33. Kitchen

Kitchen has taken some time to finish but is almost complete now:

     
First job, tiling the reinstated pantry (obviously).

  
Next, tiling the floor.


Tiling complete..........


.......apart from the LED lights for a bit of added bling.

  
Units are installed....

  
....as well as the over counter lighting.


Worktops with integrated sink.

  
Splashback and sockets... all draughtsmen love a label.  And a beer fridge.

   
All done!

Thursday, 7 January 2016

32. Bathroom and ensuites

12 months on from my last blog and we're still not finished.  No surprise there then I hear you say. Some shoddy work from our builder means we parted company last year, so it's back to just me working weekends and calling in tradesmen I can trust where required.

Anyway, here's a bit of an update:

Ensuite underway - wc frame installed, along with built in cupboard and insulation.

Similar story in the main bathroom.  You can see the Hardiebacker going onto the walls too.

The tiler arrives and it's starting to look a bit more like a bathroom.

Bath goes in and more tiling.

Matching tiles for the ensuites.

LED lighting installed below cupboards for some added bling.

Bespoke mirrored doors complete the job.