Friday, 8 January 2016

33. Kitchen

Kitchen has taken some time to finish but is almost complete now:

     
First job, tiling the reinstated pantry (obviously).

  
Next, tiling the floor.


Tiling complete..........


.......apart from the LED lights for a bit of added bling.

  
Units are installed....

  
....as well as the over counter lighting.


Worktops with integrated sink.

  
Splashback and sockets... all draughtsmen love a label.  And a beer fridge.

   
All done!